When implementing the LOTO system, we recommend that you to take these two steps first – risk analysis and equipment audit. Evaluate the initial state, the optimal settings of the LOTO system and allow to determine the time and number of LOTO elements.
Subsequently, the main LOTO directive will be developed, which is the basic document. It defines procedures, powers, lock system, contains organizational instructions for individual work shifts, for external staff, etc. Subsequently, the supply of LOTO elements is ensured.
Then a LOTO instruction is prepared, which contains information for individual devices. Energy sources, disconnection points, method of their disconnection, securing and verification that all hazardous energies have been removed. Based on these instructions, the insulation points are also marked with durable labels, which greatly facilitate the orientation of workers and thus also the correct execution of the LOTO procedure.
An equally important part of the entire LOTO system is the training of the employees concerned. This training will ensure that staff are made aware of the purpose of why LOTO is being implemented. How to proceed with the LOTO application. How to correctly apply individual LOTO elements and it is also verified whether the trained staff have sufficiently adapted the necessary knowledge and skills.
Our LOTO team of professionals can carry out your company throughout the process so that the burden on your employees is as small as possible and they can devote themselves to their work. At the end of the whole process, the LOTO system will be functional and tailored to you.